# Kitchen Pilot 001 — Result Template

Date:
Location:
Operators:
Observer:
Equipment:
Patty spec:
Bun spec:
Fries process:
Tallow/fryer setup:
Ordering simulation:

## Result summary
- 20/20 sale tokens completed: YES / NO
- Safety hard fail: YES / NO
- Rush capacity result:
- Median customer latency:
- P90 customer latency:
- Median finish active seconds:
- P90 finish active seconds:
- Remakes:
- QC units consumed:
- Edible waste:
- Operator A stress/fatigue:
- Operator B stress/fatigue:

## Sensory drift
Warm-up average:
Early rush:
Late rush:
Recovery:

## Largest measured constraint
Choose one:
- HOT
- fries
- finish
- ordering
- layout
- ingredient prep
- cleaning
- quality hold
- human fatigue

Evidence:

## Gate result
PASS / FAIL / OPEN

## One major change for Kitchen Pilot 002
Only one major system variable should change unless safety requires more.
