Inspectable TID / Market Gaps material. No interpretation is generated from this file.
public_test
Pilot result template
Template for recording the result.
Markdown preview
53 linesKitchen Pilot 001 — Result Template
Date: Location: Operators: Observer: Equipment: Patty spec: Bun spec: Fries process: Tallow/fryer setup: Ordering simulation:
Result summary
- 20/20 sale tokens completed: YES / NO
- Safety hard fail: YES / NO
- Rush capacity result:
- Median customer latency:
- P90 customer latency:
- Median finish active seconds:
- P90 finish active seconds:
- Remakes:
- QC units consumed:
- Edible waste:
- Operator A stress/fatigue:
- Operator B stress/fatigue:
Sensory drift
Warm-up average: Early rush: Late rush: Recovery:
Largest measured constraint
Choose one:
- HOT
- fries
- finish
- ordering
- layout
- ingredient prep
- cleaning
- quality hold
- human fatigue
Evidence:
Gate result
PASS / FAIL / OPEN
One major change for Kitchen Pilot 002
Only one major system variable should change unless safety requires more.